Knightley wrote:Hi,
Welcome to Dakka, really digging those boards, how long did they take to get set up?
Not so long,
You can easily carve foam by using a metal ruler and a soldering iron.
Just pass it quickly and make sure to put extra border you will remove afterwards as to metling is always too much at the beginning and the end of the line.
The bricks are either carved in wall or made one by one.
You should get that before paint & varnish
You can also use the soldering iron to "melt" some lava holes
The column are cut in a wood stick (round section) and a foam square base is put around them for stability
Shiels are cut in a plastic bottle (because of the curve)